$ 21264.00
Availability |
Odoo Online
Odoo.sh
On Premise
|
Odoo Apps Dependencies |
•
Sales (sale_management)
• Manufacturing (mrp) • Inventory (stock) • Discuss (mail) • Invoicing (account) • Employees (hr) • Purchase (purchase) |
Community Apps Dependencies | Show |
Lines of code | 8591 |
Technical Name |
mrp_master_production_schedule |
License | See License tab |
Website | http://www.openvalue.cloud |
Versions | 17.0 16.0 |
Availability |
Odoo Online
Odoo.sh
On Premise
|
Odoo Apps Dependencies |
•
Sales (sale_management)
• Manufacturing (mrp) • Inventory (stock) • Discuss (mail) • Invoicing (account) • Employees (hr) • Purchase (purchase) |
Community Apps Dependencies | Show |
Lines of code | 8591 |
Technical Name |
mrp_master_production_schedule |
License | See License tab |
Website | http://www.openvalue.cloud |
Versions | 17.0 16.0 |
MRP Master Production Schedule
In Make-To-Stock scenario, the “Master Production Schedule” process is part of the overall planning process and is fully integrated in the overall Openvalue manufacturing planning and execution solution.
The Master Production Schedule aims to ensure material availability and to increase planning stability.
This is achieved by setting products, which greatly influence company profits or which take up critical resources, as MPS relevant; this allows to check and to plan them separately in MPS process.
The planning of MPS products greatly influences the entire production planning process, even if they represent a small share of all the products to be planned.
The MPS planning run only plans the products set as MPS relevant; dependent requirements are created for the BOM level directly below the MPS planning level; however, this level and lower levels are not planned.
Frequent their changes can render the complete MRP run unstable. Therefore, the MPS parts are to be planned in a separate way before planning all the other products.
The MPS planning run in the overall planning process
· performing the planning run for master schedule items, i.e. MPS planning engine run; the MPS planning run only plans the products set as MPS relevant; dependent requirements are created for the BOM level directly below the MPS planning level; however, this level and lower levels are not planned;
· Once the “Master Production Plan” has been finely tuned for the master schedule items, performing the planning run for all remaining dependent parts, i.e. MRP planning engine run.
Total Replenishment Lead Time
The “Total Replenishment Lead Time” is a new planning parameter set at parameter master data level.
A check has been implemented to avoid entering Demand Items in the Demand Management with planned date before the Total Replenishment Lead Time.
This is to protects “frozen” Master Production Schedule and ensures a production process stable.
Rough Cut Capacity
Workcenters capacity constrainted are to be set as relevant for Rough Cut Capacity evaluation. Therefore, only the main workcenters take part to the rough-cut capacity process.
In the MPS planning run, MPS planned orders are automatically scheduled for determining MPS capacity requirements to be compared with the available capacity; the MPS capacity requirements are determined for Rough Cut capacity workcenters only.
for manufactured products, their routing is taken into account for determining the capacity loading.
for subcontracted products, a workcenter and a time cicle can be assigned to a subcontractor at supplier info level.
In case the scheduling finish date falls after the order due date, a planning note is issued in the MPS planned order list.
This is to alert the planner the manufactured order related to the conversion of the concerned planned order will have an inconsistence between planned pivot dates and scheduled dates.
A MPS capacity can be leveled by changing the planned dates and/or quantities in planned orders.
Capacity Evaluation
The capacity loading can be evaluated on weekly basis through a table pivot view, available for RCC workcenters
Master Production Schedule
After leveling rough-cut capacity plan, that’s after performing the rough-cut capacity process, all relevant planned orders can be frozen and collected by a Planning Version.
This is the Master Production Schedule. At Planning Version level, revenues and costs are determined for performing a financial evaluation for the concerned master production Schedule.
This software and associated files (the "Software") may only be used (executed, modified, executed after modifications) if you have purchased a valid license from the authors, typically via Odoo Apps, or if you have received a written agreement from the authors of the Software. You may develop Odoo modules that use the Software as a library (typically by depending on it, importing it and using its resources), but without copying any source code or material from the Software. You may distribute those modules under the license of your choice, provided that this license is compatible with the terms of the Odoo Proprietary License (For example: LGPL, MIT, or proprietary licenses similar to this one). It is forbidden to publish, distribute, sublicense, or sell copies of the Software or modified copies of the Software. The above copyright notice and this permission notice must be included in all copies or substantial portions of the Software. THE SOFTWARE IS PROVIDED "AS IS", WITHOUT WARRANTY OF ANY KIND, EXPRESS OR IMPLIED, INCLUDING BUT NOT LIMITED TO THE WARRANTIES OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE AND NONINFRINGEMENT. IN NO EVENT SHALL THE AUTHORS OR COPYRIGHT HOLDERS BE LIABLE FOR ANY CLAIM, DAMAGES OR OTHER LIABILITY, WHETHER IN AN ACTION OF CONTRACT, TORT OR OTHERWISE, ARISING FROM, OUT OF OR IN CONNECTION WITH THE SOFTWARE OR THE USE OR OTHER DEALINGS IN THE SOFTWARE.