An Engineering Change Notice (ECN) is a document authorizing and recording design changes
throughout the prototyping and life-cycle phases of a product. ECN documentation contains the justification for changes
made to a component or system once the initial design is complete.
Engineering Change Notice
Kaertech Limited
$ 162.90